In order to build the shed I needed to lift the old boat up into the air and assemble the framework under it. Putting together a pair of 4.5 metre “A” frames with a chain hoist from a beam to lift her about 3 metres into the air... Once done, assembled the wall sections under her, and lowered. A few more ribs, and soon be ready to clad.
0 Comments
Leave a Reply. |
Serge PolloniTimber Framer Archives
March 2024
Categories |